551 W 21

Construction is progressing at Foster + Associates' 551 W 21 near the High Line, where structure has topped out and façade installation is underway. Pre-cast panels are currently being installed on the lower podium floors of the 19-story, 44-unit condo building.
The northwest corner from 11th Avenue.
Pre-cast panel in detail.
Pre-cast panels on the southwest corner of the podium.
Pre-cast panels on the west façade of the podium.
The southwest corner of the tower from 11th Avenue.
The south façade from West 21st Street.
Architects: Foster + Partners (Design), Beyer Blinder Belle (Executive); Developers: SR Capital; Program: Residential; Location: Chelsea, New York, NY; Completion: 2015.
Field Condition