Construction Update: West Thames Street Pedestrian Bridge
![Construction Update: West Thames Street Pedestrian Bridge](https://images.squarespace-cdn.com/content/v1/5164b16ae4b0cac6e79b081f/1560791481407-WBVNRPZ3H1214HAQJE8I/20190614-West+Thames+Street+Bridge-DSC09454.jpg)
The steel structure for the West Thames Street Pedestrian Bridge has been lifted into place next to 50 West Street. This will be the permanent replacement for the SHoP-designed Rector Street Pedestrian Bridge that was erected as a temporary bridge after the attacks on September 11, 2001 . Designed by WXY Architecture and engineers at Weidlinger Associates, the bridge will span 230 feet over West Street to provide a direct pedestrian connection to Battery Park City from the Financial District.
Architect: WXY Architecture; Structural Engineer: Weidlinger Associates; Client: Lower Manhattan Development Corporation and the Battery Park City Authority; Location: Financial District, New York, NY; Completion: 2019.
Field Condition